CA.IX.B.K4
KnowledgeA stabilized approach, including energy management concepts.
From the FAA library
- Chapter 9: Approaches and Landings › Final Approach › Stabilized Approach Concept
cause a sudden decrease in lift, an excessive sink rate, and an aggravated unstable condition. If the approach is too high or too low, it may not be possible to establish a stabilized approach, and the pilot should execute ... around. Typically, pilots go-around if unable to establish a stabilized approach by 500 ft above airport elevation in visual meteorological conditions (VMC) or 1,000 ft above airport elevation in instrument conditions (IMC). For a typical GA piston aircraft…
- Chapter 9: Approaches and Landings › Short-Field Approach and Landing
When safety and conditions permit, a wider-than-normal pattern with a longer final approach may be used. This allows the pilot ample opportunity to adjust and stabilize the descent angle after the airplane is configured and trimmed. A stabilized ... approach is essential. The procedures for landing on a short field or for landing approaches over obstacles as recommended in the AFM/POH should be used. [Figure 9-22 and Figure 9-23] These procedures generally involve a final approach started…
- Chapter 9: Approaches and Landings › Power-Off Accuracy Approaches › 180° Power-Off Approach
full attention is given to making a good, safe landing rather than concentrating on the selected landing spot. The approach angle used and final approach airspeed determine the probability of landing on the spot, and late adjustments to these parameters ... from the spot than to make a poor landing precisely on or just past the spot. 180° Power-Off Approach The 180° power-off approach is executed by gliding with idle power from a given point on a downwind…
- Chapter 4: Approaches › Stabilized Approach
This process is simplified by maintaining a constant approach speed, descent rate, vertical flight path, and configuration during the final stages of an approach. This is referred to as the stabilized approach concept. A stabilized approach is essential for safe ... turbojet operations and commercial turbojet operators must establish and use procedures that result in stabilized approaches. A stabilized approach is also strongly recommended for propeller-driven airplanes and helicopters. You should limit configuration changes at low altitudes to those changes…
- Chapter 4: Approaches › Final Approach Segment
Final Approach Segment The final approach segment for an approach with vertical guidance or a precision approach begins where the glideslope/glidepath intercepts the minimum glideslope/ glidepath intercept altitude shown on the approach chart. If ATC authorizes a lower intercept altitude ... final approach segment begins upon glideslope/glidepath interception at that altitude. For a non-precision approach, the final approach segment begins either at a designated FAF, which is depicted as a cross on the profile view, or at the point where…
- Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Approaches to Parallel Runways
Approaches to Parallel Runways Procedures permit ILS instrument approach operations to dual or triple parallel runway configurations. A parallel approach is an ATC procedure that permits parallel ILS approach to airports with parallel runways separated by at least ... feet between centerlines. Wherever parallel approaches are in progress, pilots are informed that approaches to both runways are in use. Simultaneous approaches are permitted to runways: 1. With centerlines separated by 4,300 to 9,000 feet; 2. Equipped with…