Tutor Platform

IH.VI.D.K1

Knowledge

Elements related to the pilot’s responsibilities, and the environmental, operational, and meteorological factors that affect landing from a straight-in approach.

Study note

Get a short, cited explanation of this element written from the FAA handbooks: the core idea, the numbers that matter, common test traps, and a quick self-check.

Sign in to generate a study note

From the FAA library

  • Chapter 5. Air Traffic Procedures › Section 4. Arrival Procedures › 5-4-16. Simultaneous Close Parallel PRM Approaches and Simultaneous Offset Instrument A…

    Simultaneous Offset Instrument Approach (SOIA). 1. SOIA is a procedure used to conduct simultaneous approaches to runways spaced less than 3,000 feet, but at least 750 feet apart. The SOIA procedure utilizes a straight-in PRM approach ... runway, and a PRM offset approach with glideslope/glidepath to the adjacent runway. In SOIA operations, aircraft are paired, with the aircraft conducting the straight-in PRM approach always positioned slightly ahead of the aircraft conducting the offset PRM approach…

  • Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Approaches to Parallel Runways

    Approaches to Parallel Runways Procedures permit ILS instrument approach operations to dual or triple parallel runway configurations. A parallel approach is an ATC procedure that permits parallel ILS approach to airports with parallel runways separated by at least ... feet between centerlines. Wherever parallel approaches are in progress, pilots are informed that approaches to both runways are in use. Simultaneous approaches are permitted to runways: 1. With centerlines separated by 4,300 to 9,000 feet; 2. Equipped with…

  • Chapter 10: IFR Flight › Approaches › Approach to Airport With an Operating Tower, With No Approach Control

    instrument approach and advises “change to advisory frequency approved.” When the aircraft arrives on a “cruise” clearance, ATC does not issue further clearance for approach and landing. If an approach clearance is required, ATC authorizes the pilots to execute ... choice of standard instrument approach (if more than one is published for the airport) with the phrase “Cleared for the approach” and the communications frequency change required, if any. From this point on, there is no contact with…

  • Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Radar Monitoring of Instrument Approaches

    Radar service is automatically terminated at the completion of a radar approach. No-Gyro Approach is available to a pilot under radar control who experiences circumstances wherein the directional gyro or other stabilized compass is inoperative or inaccurate. When this ... occurs, the pilot should so advise ATC and request a no-gyro vector or approach. The pilot of an aircraft not equipped with a directional gyro or other stabilized compass who desires radar handling may also request a no-gyro…

  • Chapter 10. Helicopter Operations › Section 1. Helicopter IFR Operations › 10-1-3. Helicopter Approach Procedures to VFR Heliports

    These instrument procedures may be designed to guide the helicopter to a specific landing area (Proceed Visually) or to a point-in-space with a “Proceed VFR” segment. 1. An approach to a specific landing area. This type of approach ... aligned to a missed approach point from which a landing can be accomplished with a maximum course change of 30 degrees. The visual segment from the MAP to the landing area is evaluated for obstacle hazards. These procedures are annotated…

  • Chapter 4: Approaches › NDB Approach

    Additionally, the final approach course and the extended runway centerline angle of convergence cannot exceed 30° for straight-in approaches. This type of NDB approach is afforded a minimum of 350 feet obstacle clearance. When a FAF is established ... approach, the approach design criteria changes. It also takes into account whether or not the NDB is located on or off the airport. Additionally, this type of approach can be made both moving toward or away from the NDB facility…