Tutor Platform

AA.II.B.K3

Knowledge

Malfunctions during powerplant start, procedures to address the malfunction, and any associated limitations.

Study note

Get a short, cited explanation of this element written from the FAA handbooks: the core idea, the numbers that matter, common test traps, and a quick self-check.

Sign in to generate a study note

From the FAA library

  • Chapter 5. Air Traffic Procedures › Section 4. Arrival Procedures › 5-4-9. Procedure Turn and Hold-in-lieu of Procedure Turn

    pilot is uncertain whether the ATC clearance intends for a procedure turn to be conducted or to allow for a straight-in approach, the pilot must immediately request clarification from ATC (14 CFR section 91.123). 1. On U.S. Government charts ... barbed arrow indicates the maneuvering side of the outbound course on which the procedure turn is made. Headings are provided for course reversal using the 45 degree type procedure turn. However, the point at which the turn may be commenced…

  • Chapter 2: Ground Operations › Engine Starting

    taxiway or runway. Note that at night, the Emergency Stop signal is used for all stop indications . Engine Starting Airplane engines vary substantially and specific procedures for engine starting should be accomplished in reference to the approved engine start checklist ... detailed in the airplane’s AFM/POH. However, some generally accepted hazard mitigation practices and procedures are outlined in this section. Prior to engine start, the pilot needs to ensure that the ramp area surrounding the airplane is clear of persons…

  • Chapter 5. Air Traffic Procedures › Section 2. Departure Procedures › 5-2-1. Pre-taxi Clearance Procedures

    Section 2. Departure Procedures 5-2-1. Pre-taxi Clearance Procedures a. Certain airports have established pre-taxi clearance programs whereby pilots of departing instrument flight rules (IFR) aircraft may elect to receive their IFR clearances before they start taxiing ... takeoff. The following provisions are included in such procedures: 1. Pilot participation is not mandatory. 2. Participating pilots call clearance delivery or ground control not more than 10 minutes before proposed taxi time. 3. IFR clearance (or delay information…

  • Chapter 5. Air Traffic Procedures › Section 4. Arrival Procedures › 5-4-16. Simultaneous Close Parallel PRM Approaches and Simultaneous Offset Instrument A…

    high update rate surveillance sensor is a component of this system only for specific runway spacing. Additional procedures for simultaneous independent approaches are described in paragraph 5-4-15, Simultaneous Independent ILS/RNAV/GLS Approaches. 2. Simultaneous Close Parallel PRM approaches, whether ... AAUP, and use of a secondary PRM communications frequency. PRM approaches are depicted on a separate IAP titled (Procedure type) PRM Rwy XXX (Simultaneous Close Parallel or Close Parallel). ATC does not use the word “independent” when advertising these operations…

  • Chapter 15: Transition to Turbopropeller-Powered Airplanes › Operational Considerations

    over temperature condition for more than a very seconds without experiencing serious damage. Engine temperatures get hotter during starting than at any other time. Thus, turbine engines have minimum rotational speeds for introducing fuel into the combustion chambers during startup ... part of the pilot remain crucial until the engine is running at a stable speed. Successful engine starting depends on assuring the correct minimum battery voltage before initiating start or employing a ground power unit (GPU) of adequate output. After…

  • Chapter 5. Air Traffic Procedures › Section 4. Arrival Procedures › 5-4-5. Instrument Approach Procedure (IAP) Charts

    type of equipment may be used to execute the final approach (e.g., VOR or GPS RWY 15). NOTE-This procedure identification method has changed and these procedures will be revised in the course of the normal procedure amendment process ... slash and equipment (e.g., /DME) information will be removed with future amendments. Pilots should review the procedure’s notes, planview annotations, and PBN/equipment requirements boxes to determine the capability needed to accomplish the procedure. (b) In some cases, other types…