Tutor Platform

AA.III.I.S2

Skill

Reject the takeoff if the powerplant failure occurs at a point during the takeoff where the rejected takeoff procedure can be initiated and the airplane can be safely stopped on the remaining runway/ waterway (AMEL, AMES).

Study note

Get a short, cited explanation of this element written from the FAA handbooks: the core idea, the numbers that matter, common test traps, and a quick self-check.

Sign in to generate a study note

From the FAA library

  • Chapter 16: Transition to Jet-Powered Airplanes › Jet Airplane Takeoff and Climb › Rejected Takeoff

    takeoff and climb-out should be accomplished in accordance with a standard takeoff and departure profile developed for the particular make and model airplane. [Figure 16-13] Figure 16-13. Sample takeoff and departure profile. The pilot not flying should ... call out V1. After passing V1 speed on the takeoff roll, it is no longer mandatory for the pilot flying to keep a hand on the thrust levers. The point for abort has passed, and both hands may be placed…

  • Chapter 16: Transition to Jet-Powered Airplanes › Jet Airplane Takeoff and Climb › Takeoff Roll

    pilot not flying. Retarding a thrust lever would only be necessary in case an engine exceeds any limitation. Takeoff data, including V1/VR and V2 speeds, takeoff power settings, and required field length should be computed prior to each takeoff ... make and model without an FMS, the data should be recorded on a takeoff data card. This data is based on airplane weight, runway length available, runway gradient, field temperature, field barometric pressure, wind, icing conditions, and runway condition. Both…

  • Chapter 6: Takeoffs and Departure Climbs › Rejected Takeoff/Engine Failure

    Rejected Takeoff/Engine Failure Emergency or abnormal situations can occur during a takeoff that require a pilot to reject the takeoff while still on the runway. Circumstances such as a malfunctioning powerplant, inadequate acceleration, runway incursion, or air traffic ... conflict may be reasons for a rejected takeoff. Prior to takeoff, the pilot should identify a point along the runway at which the airplane should be airborne. If that point is reached and the airplane is not airborne, immediate…

  • Chapter 6: Takeoffs and Departure Climbs › Short-Field Takeoff and Maximum Performance Climb › Takeoff Roll

    Takeoff Roll Taking off from a short field requires the takeoff to be started from the very beginning of the takeoff area. At this point, the airplane is aligned with the intended takeoff path. If the airplane manufacturer recommends ... flaps, they are extended the proper amount before beginning the takeoff roll. This allows the pilot to devote full attention to the proper technique and the airplane’s performance throughout the takeoff. The pilot should apply takeoff power smoothly…

  • 14 CFR Part 141, Appendix J to Part 141—Aircraft Type Rating Course, For Other Than an Airline Transport Pilot Certificate

    Aircraft Type Rating Course, For Other Than an Airline Transport Pilot Certificate (1) A type rating for an airplane—single-engine course: (i) Preflight preparation; (ii) Preflight procedures; (iii) Takeoff and departure phase; (iv) In-flight maneuvers; (v) Instrument procedures ... Landings and approaches to landings; (vii) Normal and abnormal procedures; (viii) Emergency procedures; and (ix) Postflight procedures. (2) A type rating for an airplane—multiengine course: (i) Preflight preparation; (ii) Preflight procedures; (iii) Takeoff and departure phase; (iv) In-flight…