AP.V.E.S7
SkillConduct the approach briefing, coordinate with crew, if applicable, and complete the appropriate checklist(s) in a timely manner.
From the FAA library
- Chapter 5. Air Traffic Procedures › Section 4. Arrival Procedures › 5-4-16. Simultaneous Close Parallel PRM Approaches and Simultaneous Offset Instrument A…
Simultaneous Offset Instrument Approach (SOIA). 1. SOIA is a procedure used to conduct simultaneous approaches to runways spaced less than 3,000 feet, but at least 750 feet apart. The SOIA procedure utilizes a straight-in PRM approach ... runway, and a PRM offset approach with glideslope/glidepath to the adjacent runway. In SOIA operations, aircraft are paired, with the aircraft conducting the straight-in PRM approach always positioned slightly ahead of the aircraft conducting the offset PRM approach…
- Chapter 4: Approaches › Example Approach Briefing
Example Approach Briefing During an instrument approach briefing, the name of the airport and the specific approach procedure should be identified to allow other crewmembers the opportunity to cross-reference the chart being used for the brief. This ensures that ... pilots intending to conduct an instrument approach have collectively reviewed and verified the information pertinent to the approach. Figure 4-27 gives an example of the items to be briefed and their sequence. Although the following example is based…
- Chapter 4: Approaches › Final Approach Segment
Final Approach Segment The final approach segment for an approach with vertical guidance or a precision approach begins where the glideslope/glidepath intercepts the minimum glideslope/ glidepath intercept altitude shown on the approach chart. If ATC authorizes a lower intercept altitude ... final approach segment begins upon glideslope/glidepath interception at that altitude. For a non-precision approach, the final approach segment begins either at a designated FAF, which is depicted as a cross on the profile view, or at the point where…
- Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Approaches to Parallel Runways
Approaches to Parallel Runways Procedures permit ILS instrument approach operations to dual or triple parallel runway configurations. A parallel approach is an ATC procedure that permits parallel ILS approach to airports with parallel runways separated by at least ... feet between centerlines. Wherever parallel approaches are in progress, pilots are informed that approaches to both runways are in use. Simultaneous approaches are permitted to runways: 1. With centerlines separated by 4,300 to 9,000 feet; 2. Equipped with…
- Chapter 4: Approaches › Approach Clearance
meet the precision approach standards of ICAO Annex 10, but provides course and glidepath deviation information. For example, Baro-VNAV, LDA with glidepath, LNAV/VNAV and LPV are APV approaches. Non-precision approach (NPA)—an instrument approach based on a navigation ... that provides course deviation information but no glidepath deviation information. For example, VOR, TACAN, LNAV, NDB, LOC, and ASR approaches are examples of NPA procedures. Missed Approach Segment The missed approach segment begins at the MAP and ends…
- Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Timed Approaches From a Holding Fix
depart the FAF inbound (nonprecision approach), or the outer marker or fix used in lieu of the outer marker inbound (precision approach), indicates that timed approach procedures are being utilized. In lieu of holding, the controller may use radar vectors ... final approach course to establish a distance between aircraft that ensures the appropriate time sequence between the FAF and outer marker or fix used in lieu of the outer marker and the airport. Each pilot in the approach sequence…