PI.VIII.A.S2
SkillEstablish two-way communications with air traffic control (ATC) appropriate for the phase of flight or approach segment, and use proper communication phraseology.
From the FAA library
- Chapter 4: Approaches › Approach Control
Approach Control Approach control is responsible for controlling all instrument flights operating within its area of responsibility. Approach control may serve one or more airports. Control is exercised primarily through direct pilot and controller communication and airport surveillance radar ... Prior to arriving at the initial approach fix (IAF), instructions will be received from the air route traffic control center (ARTCC) to contact approach control on a specified frequency. Where radar is approved for approach control service, it is used…
- Chapter 4: Approaches › Final Approach Segment
Final Approach Segment The final approach segment for an approach with vertical guidance or a precision approach begins where the glideslope/glidepath intercepts the minimum glideslope/ glidepath intercept altitude shown on the approach chart. If ATC authorizes a lower intercept altitude ... final approach segment begins upon glideslope/glidepath interception at that altitude. For a non-precision approach, the final approach segment begins either at a designated FAF, which is depicted as a cross on the profile view, or at the point where…
- Chapter 5. Air Traffic Procedures › Section 1. Preflight › 5-1-5. Flight Plan - VFR Flights
Flight Plan - VFR Flights (See Appendix 4, FAA Form 7233-4 – International Flight Plan) a. The requirements for the filing and activation of VFR flight plans can vary depending in which airspace the flight is operating. Pilots are responsible ... activating flight plans with a Flight Service Station. Control tower personnel do not automatically activate VFR flight plans. 1. Within the continental U.S., a VFR flight plan is not normally required. 2. VFR flights (except for DoD and law enforcement…
- Chapter 10: IFR Flight › Approaches › Approach to Airport With an Operating Tower, With No Approach Control
instrument approach and advises “change to advisory frequency approved.” When the aircraft arrives on a “cruise” clearance, ATC does not issue further clearance for approach and landing. If an approach clearance is required, ATC authorizes the pilots to execute ... choice of standard instrument approach (if more than one is published for the airport) with the phrase “Cleared for the approach” and the communications frequency change required, if any. From this point on, there is no contact with ATC…
- Pilot/Controller Glossary › A
SYSTEM.) APB- (See AUTOMATED PROBLEM DETECTION BOUNDARY.) APD- (See AUTOMATED PROBLEM DETECTION.) APDIA- (See AUTOMATED PROBLEM DETECTION INHIBITED AREA.) APPROACH CLEARANCE- Authorization by ATC for a pilot to conduct an instrument approach. The type of instrument approach for which ... clearance and other pertinent information is provided in the approach clearance when required. (See CLEARED APPROACH.) (See INSTRUMENT APPROACH PROCEDURE.) (Refer to AIM.) (Refer to 14 CFR part 91.) APPROACH CONTROL FACILITY- A terminal ATC facility that provides approach control…
- Chapter 5. Air Traffic Procedures › Section 4. Arrival Procedures › 5-4-3. Approach Control
Approach Control a. Approach control is responsible for controlling all instrument flight operating within its area of responsibility. Approach control may serve one or more airfields, and control is exercised primarily by direct pilot and controller communications. Prior ... arriving at the destination radio facility, instructions will be received from ARTCC to contact approach control on a specified frequency. b. Radar Approach Control. 1. Where radar is approved for approach control service, it is used not only for radar…