Transition to a normal landing approach only when the aircraft is in a position from which a descent to a landing on the runway, or to a heliport, can be made at a normal rate of descent using normal maneuvering.

Study note

Get a short, cited explanation of this element written from the FAA handbooks: the core idea, the numbers that matter, common test traps, and a quick self-check.

Sign in to generate a study note

From the FAA library

  • Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Approaches to Parallel Runways

    Approaches to Parallel Runways Procedures permit ILS instrument approach operations to dual or triple parallel runway configurations. A parallel approach is an ATC procedure that permits parallel ILS approach to airports with parallel runways separated by at least ... feet between centerlines. Wherever parallel approaches are in progress, pilots are informed that approaches to both runways are in use. Simultaneous approaches are permitted to runways: 1. With centerlines separated by 4,300 to 9,000 feet; 2. Equipped with…

  • Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Missed Approaches

    Minimums Pilots may not operate an aircraft at any airport below the authorized MDA or continue an approach below the authorized DA/DH unless: 1. The aircraft is continuously in a position from which a descent to a landing ... intended runway can be made at a normal descent rate using normal maneuvers; 2. The flight visibility is not less than that prescribed for the approach procedure being used; and 3. At least one of the following visual references…

  • Chapter 5. Air Traffic Procedures › Section 4. Arrival Procedures › 5-4-16. Simultaneous Close Parallel PRM Approaches and Simultaneous Offset Instrument A…

    Simultaneous Offset Instrument Approach (SOIA). 1. SOIA is a procedure used to conduct simultaneous approaches to runways spaced less than 3,000 feet, but at least 750 feet apart. The SOIA procedure utilizes a straight-in PRM approach ... runway, and a PRM offset approach with glideslope/glidepath to the adjacent runway. In SOIA operations, aircraft are paired, with the aircraft conducting the straight-in PRM approach always positioned slightly ahead of the aircraft conducting the offset PRM approach…

  • Chapter 10: IFR Flight › Approach to an Airport With an Operating Tower, With an Approach Control › Circling Approaches

    Side-Step Maneuver ATC may authorize a side-step maneuver to either one of two parallel runways that are separated by 1,200 feet or less, followed by a straight-in landing on the adjacent runway. Aircraft executing a side ... step maneuver are cleared for a specified nonprecision approach and landing on the adjacent parallel runway. For example, “Cleared ILS runway 7 left approach, side-step to runway 7 right.” The pilot is expected to commence the side-step maneuver…

  • Chapter 4: Approaches › Simultaneous Approaches To Parallel Runways

    Simultaneous Approaches To Parallel Runways Airports that have two or more parallel runways may be authorized to use simultaneous parallel approaches to maximize the capacity of the airport. Depending on the runway centerline separation and ATC procedures, there are three ... classifications of simultaneous parallel approaches: Simultaneous dependent approaches, simultaneous independent approaches and simultaneous independent close parallel approaches. A simultaneous dependent approach differs from a simultaneous independent approach in that the minimum distance between parallel runway centerlines may be less…

  • Chapter 4: Approaches › Final Approach Segment

    Final Approach Segment The final approach segment for an approach with vertical guidance or a precision approach begins where the glideslope/glidepath intercepts the minimum glideslope/ glidepath intercept altitude shown on the approach chart. If ATC authorizes a lower intercept altitude ... final approach segment begins upon glideslope/glidepath interception at that altitude. For a non-precision approach, the final approach segment begins either at a designated FAF, which is depicted as a cross on the profile view, or at the point where…